Image Source: edp.com
Image Source: efacec.com

Project information

  • Country: Portugal
  • Category: Hydro
  • Client: Efacec
  • Final Client: EDP
  • Project date: 2010-2011

This project consists of 520 MW divided in two phases being that phase 2 was completed in 2012 which included the installation of the generator groups as well as the electrical infrastructure.

The activities in this project included the upgrade of the SCADA system and the connection with the customer Control Center, for both phases.