Project information
- Country: Greece
- Category: Power (HVDC)
- Client: Ariadne Interconnection
- Final Client: Ariadne Interconnection
- Project date: 2020-
- Project: 4C Offshore
This HVDC project provides an interconnection between Attica and Heraklion (Crete) by means of two submarine 500 kV cables, with a total transmission capacitiy of 1.000 MW. Commercial operation date by end of 2024.
Our support is focused on the two HVDC stations, mainly with electrical primary and secondary equipment/systems.