Image Source: tsf.pt
Image Source: haengenharia.pt
Image Source: cjceng.com.br

Project information

  • Country: Portugal
  • Category: Others (Transportation)
  • Client: Efacec
  • Final Client: Metro do Porto
  • Project date: 2010-2012

This project refers to the metro line F expansion (from Fânzeres to Dragon Station) and its respective substations and stations.

The activities involved the configuration, installation and commissioning of the substation automation and protection systems as well as the integration and testing with control center.